01

In order to reduce the undesirable impact on the ozone layer, the project accommodates eco-friendly fire-fighting and refrigeration systems in the building.

02

An energy savings of 18.99% is indicated through the energy modeling report over ASHRAE 90.1-2010 baseline.

03

During simulation, the proposed case efficiency and integrated part load efficiency of air-conditioning equipment are considered at 5.8 and 7.1, respectively.

04

Both structures have a wall window ratio of less than 25%.

05 The Guidelines of ASHRAE have been followed in terms of LPD values and for case of proposing we have used less than 30% LPD compared to Base case For Office: 0.78 W/ft2 For Washrooms: 0.46 W/ft2 For Passageways: 0.46 W/ft2 For Elevator Lobby: 0.44 W/ft2 For Staircases: 0.48 W/ft2
06 The following schedules have been assumed for the project based on ASHRAE standards: Equipment Schedule: Office: 9 am to 6 pm 90%; Occupancy Schedule: Office: 9am to 6pm 95%; Lighting Schedule: Office 9 am to 6 pm 90% HVAC Schedule: Office 8 am to 6 pm 90%
07 We have a competent and effective system design to save on Cooling Load. Base case: Inclusive of VFD pumps and enhanced COP along with cooling as well as heating capacity size of 1.
08 The tenants are required to use the fixture on lighting as it is necessary and instructed by the owner of the project.
09 Well-ventilated, fresh air in the usually occupied areas will surpass the least rates of ventilation as set in ASHRAE standard 62.1-2010.
10 The project has implemented the following two ways to satisfy air filteration compliance:
1. Entryway system at the building's main entrance 2. Use of MERV-13 filters

11 The provision of C02 sensors will be offered in the returning of air (so as to observe & track a level that is 530 ppm maximum) in all of the areas that are occupied on a regular basis.

05 The Guidelines of ASHRAE have been followed in terms of LPD values And for case of proposing we have used less than 30% LPD compared to Base case: For Office: 0.78 W/ft2 For Washrooms: 0.46 W/ft2 For Passageways: 0.46 W/ft2 For Elevator Lobby: 0.44 W/ft2 For Staircases: 0.48 W/ft2
06 The following schedules have been assumed for the project based on ASHRAE standards: Equipment Schedule: Office: 9 am to 6 pm 90%; Occupancy Schedule: Office: 9am to 6pm 95%; Lighting Schedule: Office 9 am to 6 pm 90% HVAC Schedule: Office 8 am to 6 pm 90%
07 We have a competent and effective system design to save on Cooling Load. Base case: Inclusive of VFD pumps and enhanced COP along with cooling as well as heating capacity size of 1.
08 The tenants are required to use the fixture on lighting as it is necessary and instructed by the owner of the project.
09 Well-ventilated, fresh air in the usually occupied areas will surpass the least rates of ventilation as set in ASHRAE standard 62.1-2010.
10 The project has implemented the following two ways to satisfy air filteration compliance: to meet the compliance for air filteration:
1. Entryway system at the building's main entrance 2. Use of MERV-13 filters

11 The provision of C02 sensors will be offered in the returning of air (so as to observe & track a level that is 530 ppm maximum) in all of the areas that are occupied on a regular basis.